In Luanda, Angola the installation of drainage systems for sewerage disposal is one stage of the rehabilitation and expansion of the “21 de Janeiro" Avenue on the zone between the Higher Nursing Institute and “Multiperfil” clinic.
"ANGOP reports on Tuesday at the site that the undertaking is part of the sixth phase of the Luanda Basic Sanitation Programme, which also encompasses the installing of vertical and horizontal signs, public lighting, road divider and pedestrians sidewalks along both sides of road."
"The drainage works cover more than 500 meters of the descending road to Multiperfil clinic."
"The “21 de Janeiro” Avenue comprises the link with the Samba road in the outskirts of the Presidential Guard Unit (UGP), the “4 de Fevereiro” Airport roundabout, until reaching the “Tourada” area."